Operator · Great Britain · code TL

Thameslink

Thameslink trains reached their destination on average 8 min late over the last 30 days, based on 445 timed arrivals out of 901 services; 61% were within 5 minutes.

Counted from 14 September 2026 to 14 September 2026, as of 14 September 2026. Facts from the rail feeds we archive; nothing on this page is a prediction. How we count.

61%
within 5 min at the destination, of 445
8 min
late on average
1
cancelled, of 901
142
stations served

Punctuality

How Thameslink has run

Every service the feeds attribute to Thameslink, measured on arrival at its destination against the public timetable. Half of them were within 3 min and four in five were within 9 min. 1 service was cancelled (0.1%). The platform changed after being announced on 1% of 659 calls with a platform. The busiest hour is 09:00–10:00 (59 services); the worst day was Monday 14 September 2026 (8 min late on average).

Punctuality of Thameslink services, measured at each service's destination. Rates show the sample they are counted from; “—” means no figure. Platform changes are counted over arrivals with a platform.
Measure7 days14 September 202614 September 202630 days14 September 202614 September 2026All time14 September 202614 September 2026
Services901901901
Within 5 minutes61% of 44561% of 44561% of 445
Average delay8 min of 4458 min of 4458 min of 445
Half were within3 min3 min3 min
Four in five were within9 min9 min9 min
Cancelled1 of 9011 of 9011 of 901
Cancelled at some stops000
Platform changed1% of 6591% of 6591% of 659
Busiest hour09:00–10:00 (59)09:00–10:00 (59)09:00–10:00 (59)
Worst day14 September 2026 (8 min)14 September 2026 (8 min)14 September 2026 (8 min)

Busiest stations

Busiest routes

Compare operators on the leaderboards.