Route · Great Britain

London Bridge to Caterham

Trains from London Bridge to Caterham arrived on average 2 min late over the last 30 days, based on 32 timed arrivals out of 37 services; 91% were within 5 minutes.

Counted from 14 September 2026 to 14 September 2026, as of 14 September 2026. Facts from the rail feeds we archive; nothing on this page is a prediction. How we count.

91%
within 5 min at Caterham, of 32
2 min
late on average
0
cancelled, of 37

Drawn between the two stations, not along the track.

Punctuality

How this route has run

A service counts on this route when London Bridge is its origin and Caterham its destination; delay is measured on arrival at Caterham. Half of them were on time and four in five were within 1 min. No services were cancelled over the last 30 days. The platform changed after being announced on 0% of 37 calls with a platform. The busiest hour is 06:00–07:00 (2 services); the worst day was Monday 14 September 2026 (2 min late on average).

Punctuality of trains from London Bridge to Caterham, measured at Caterham. Rates show the sample they are counted from; “—” means no figure. Platform changes are counted over arrivals with a platform.
Measure7 days14 September 202614 September 202630 days14 September 202614 September 2026All time14 September 202614 September 2026
Services373737
Within 5 minutes91% of 3291% of 3291% of 32
Average delay2 min of 322 min of 322 min of 32
Half were withinunder a minuteunder a minuteunder a minute
Four in five were within1 min1 min1 min
Cancelled0 of 370 of 370 of 37
Cancelled at some stops000
Platform changed0% of 370% of 370% of 37
Busiest hour06:00–07:00 (2)06:00–07:00 (2)06:00–07:00 (2)
Worst day14 September 2026 (2 min)14 September 2026 (2 min)14 September 2026 (2 min)

Who runs it