Route · Great Britain

London Waterloo to Alton

Trains from London Waterloo to Alton arrived on average 3 min late over the last 30 days, based on 26 timed arrivals out of 31 services; 88% were within 5 minutes.

Counted from 14 September 2026 to 14 September 2026, as of 14 September 2026. Facts from the rail feeds we archive; nothing on this page is a prediction. How we count.

88%
within 5 min at Alton, of 26
3 min
late on average
0
cancelled, of 31

Drawn between the two stations, not along the track.

Punctuality

How this route has run

A service counts on this route when London Waterloo is its origin and Alton its destination; delay is measured on arrival at Alton. Half of them were within 2 min and four in five were within 3 min. No services were cancelled over the last 30 days. The platform changed after being announced on 0% of 31 calls with a platform. The busiest hour is 00:00–01:00 (2 services); the worst day was Monday 14 September 2026 (3 min late on average).

Punctuality of trains from London Waterloo to Alton, measured at Alton. Rates show the sample they are counted from; “—” means no figure. Platform changes are counted over arrivals with a platform.
Measure7 days14 September 202614 September 202630 days14 September 202614 September 2026All time14 September 202614 September 2026
Services313131
Within 5 minutes88% of 2688% of 2688% of 26
Average delay3 min of 263 min of 263 min of 26
Half were within2 min2 min2 min
Four in five were within3 min3 min3 min
Cancelled0 of 310 of 310 of 31
Cancelled at some stops000
Platform changed0% of 310% of 310% of 31
Busiest hour00:00–01:00 (2)00:00–01:00 (2)00:00–01:00 (2)
Worst day14 September 2026 (3 min)14 September 2026 (3 min)14 September 2026 (3 min)

Who runs it