Route · Great Britain

Uckfield to London Bridge

Trains from Uckfield to London Bridge: 20 services were recorded over the last 30 days, but only 7 had a timed arrival, fewer than the 20 needed before a punctuality figure is published.

Counted from 14 September 2026 to 14 September 2026, as of 14 September 2026. Facts from the rail feeds we archive; nothing on this page is a prediction. How we count.

20
services recorded

Drawn between the two stations, not along the track.

Punctuality

How this route has run

A service counts on this route when Uckfield is its origin and London Bridge its destination; delay is measured on arrival at London Bridge. 12 services were cancelled (60%). Not enough calls with a platform yet to give a platform-change figure (19 so far). The busiest hour is 07:00–08:00 (2 services).

Punctuality of trains from Uckfield to London Bridge, measured at London Bridge. Rates show the sample they are counted from; “—” means no figure. Platform changes are counted over arrivals with a platform.
Measure7 days14 September 202614 September 202630 days14 September 202614 September 2026All time14 September 202614 September 2026
Services202020
Within 5 minutesnot enough yet (7)not enough yet (7)not enough yet (7)
Average delaynot enough yet (7)not enough yet (7)not enough yet (7)
Half were within
Four in five were within
Cancelled12 of 2012 of 2012 of 20
Cancelled at some stops000
Platform changednot enough yet (19)not enough yet (19)not enough yet (19)
Busiest hour07:00–08:00 (2)07:00–08:00 (2)07:00–08:00 (2)
Worst day

Who runs it